Retaining walls that hold
Proper footings, ag drainage and free-draining gravel behind every wall we build.
Why retaining walls fail
Most walls that lean or crack fail for the same reason: water building up behind them. We build every wall on a footing sized to the job, with an ag pipe at the base and free-draining gravel behind it, so the pressure has somewhere to go.
Walls we build
Sandstone and natural stone walls
Sandstone suits Sydney like nothing else. It can be laid as split blocks, sawn blocks or rough-faced boulders, and it ages well. It’s heavy and strong, which makes it a good choice for taller walls and terraces when it sits on a proper footing.
Rendered block walls
Reinforced concrete block walls, core-filled and rendered to match the house. They give a clean, modern finish and can be built to a height an engineer specifies.
Sleeper walls
Concrete or timber sleepers between steel posts set in concrete. Concrete sleepers come in timber-look and stone-look finishes and won’t rot. Sleeper walls are a cost-effective choice for lower walls and long runs.
Garden and planter walls
Low walls that edge garden beds, create raised planters or seats, and tidy up level changes around paving and lawn.
Terracing for sloping blocks
A series of lower walls instead of one tall one. Terracing turns a steep block into level, usable areas for lawn, garden beds and entertaining, and lower walls are often simpler to approve and build.
How we build a retaining wall
- Set out and levels. The wall line, finished heights and what sits above and below it are confirmed first.
- Excavation. Digging out for the footing and the drainage zone behind the wall.
- Footing. Concrete footing sized for the wall’s height and what it holds back.
- The wall. Stone, block or sleepers built to line and level.
- Drainage. Ag pipe at the base, wrapped in geotextile fabric, with free-draining gravel behind the wall, connected to a proper discharge point.
- Backfill and finish. Compacted backfill, capping, render or planting, and the area around the wall made good.
Height, approvals and engineering
Low garden walls usually don’t need approval. Taller walls, walls close to a boundary, and walls that hold up a driveway, a building or a pool often need an engineer’s design and council or certifier approval. The rules depend on the height, where the wall sits and what’s above it. We’ll tell you at the site visit what applies to your wall, and arrange the engineering when it’s needed.
Fixing or replacing a failing wall
Signs a wall is in trouble:
- Leaning or bulging out at the face
- Cracks through the blocks, render or mortar
- Water seeping out at the base after rain
- Gaps opening between the wall and the ground above
- Rotting or bowing timber sleepers
Some walls can be repaired, for example by adding drainage behind them. Others need rebuilding. We’ll tell you which, and why.
What affects the price
- The height and length of the wall
- The material: sandstone, rendered block or sleepers
- Access for machinery and materials
- How much soil has to be dug out and taken away
- Drainage, and where it can discharge
- Whether an engineer’s design or approval is needed
Every quote is itemised, so you can see where the money goes.
Part of the bigger picture
A wall changes the levels around it. We plan the steps, paving, drainage and planting next to it, so the whole area works together.
Get a quote
Every job is quoted to your site after a visit. No set packages.
Book a site visit 0423 830 285FAQ
Retaining Walls: common questions
Do I need council approval for a retaining wall?
It depends on the height, where the wall sits and what it holds back. Taller walls and walls near a boundary often need an engineer’s design or council approval. We’ll tell you at the site visit.
Why is my existing wall leaning?
Usually water pressure building up behind it, a footing that’s too small, or both. We can assess it and tell you whether it can be fixed or needs rebuilding.
What's the best material for a retaining wall?
It depends on the height, the look you want and the budget. Sandstone, rendered block and sleepers all perform well when they’re built on the right footing with drainage behind.
How long does a retaining wall last?
Stone, block and concrete sleeper walls built on a proper footing with drainage behind can last for decades. Timber sleepers have a shorter life. In every case, drainage makes the biggest difference.
Can you build a retaining wall on the boundary?
Often, yes, but boundary walls are more likely to need an engineer’s design, approval and a conversation with your neighbour. We’ll explain what’s involved at the site visit.
How much does a retaining wall cost?
It depends on the height, length, material, access and drainage. After the site visit you get an itemised quote for your wall.
Still got a question? Ask the person who’d build it.
Like what you see? Let's talk.
Every project starts with a site visit. Book yours and get an itemised quote written for your block.
They took the time to listen to my ideas, offered thoughtful suggestions, and turned what was a pretty dull space into something that actually feels like an outdoor retreat.
You can tell they actually care about the details, everything looks clean and well finished. They used good quality materials too, not the cheap stuff.
They showed up on time, worked efficiently, and paid attention to the small details. The paving and lawn came out great, and they left the place spotless after.
Always listening carefully to instructions and making sure the work was completed exactly as requested.
Talk to the builder
Call or send a message. You’ll deal with the person who quotes the job, not a call centre.
No set packages. Each project is quoted to suit the site and scope.